Oak Mar Motel | Hotel in Oakland

8.3 (294 Reviews) |  2 Bathrooms  8 Guests
Oakland Hotel | Oak Mar Motel

Hotel in Oakland

Offering free WiFi, Oak Mar Motel is located in Oakland. There's a restaurant serving American cuisine, and free private parking is available. The private bathroom is equipped with a shower, free toiletries and a hairdryer. All rooms at the motel have air conditioning and a desk. Morgantown Municipal Airport is 53 miles from the property.

Oak Mar Motel is located in Oakland.

This 9 Bedrooms Hotel is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Laundry, Parking, Balcony/Terrace, and several others. This is a good star rated property and has over 294 reviews with the average score of 8.3 . Coming to Oakland and needing a place to stay? Be it for work or for leisure, consider staying at this Hotel for your next visit, you will surely love it.

You can check the reviews and description of this 9 Bedrooms Hotel if you want to learn more about this place in Oakland. These details are authentic, as they are provided by our partner, booking.com.

This Oak Mar Motel in Oakland is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “Oak Mar Motel”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Hotel, please let us know.

Show more

Amenities

Air Conditioner
Parking
Wheelchair Accessible
Balcony/Terrace
Accessibility
Security/Safety
Restaurant
Guest Services
Breakfast
Heating
Internet
Kitchen
Laundry

Facility Overview

Breakfast
  • Restaurant
Parking
  • Private Parking
  • Accessible parking
  • Free parking
  • Parking
  • Parking on site
Accessibility
  • Toilet with grab rails
  • Wheelchair accessible
  • Lowered sink
  • Raised toilet
General
  • Air conditioning
  • Heating
  • Non-smoking rooms
  • Facilities for disabled guests
Guest Services
  • Daily housekeeping
  • Private check-in/out
  • Invoice provided
Internet
  • Wifi
  • Free Wifi
  • Internet
Outdoors
  • Outdoor furniture
Security/Safety
  • Smoke alarms
  • Fire extinguishers
  • Guest accommodation disinfected between stays
  • Use of cleaning chemicals that are effective against coronavirus
  • Guest accommodation sealed after cleaning
  • Linens, towels, and laundry washed in accordance with local authority guidelines
  • Physical distancing in dining areas
  • All plates, cutlery, glasses, and other tableware sanitized
  • Breakfast to-go containers
  • Hand sanitizer in guest accommodation and common areas
  • Staff follow all safety protocols as directed by local authorities
  • Physical distancing rules followed
  • Screens or physical barriers between staff and guests in appropriate areas

Policies

Check-in
The minimum age for check-in is 25
Pet Policy
Pets are not allowed

Please note that office hours are between 8:00 to 22:00 hours. please contact the property for arrival instructions if arriving outside the office hours.guests are required to show a photo id and credit card upon check-in. please note that all special requests are subject to availability and additional charges may apply.

Reviews

Value for money:
8.68
Location:
9.15
Staff:
9.35
Facilities:
8.48
Comfort:
8.81
Cleanliness:
9.11
Patricia
Mar 12, 2025 07:00:00 AM
Review Score:   10
USA
Reviewer Type: Couple
Travel Purpose: business
Positive: The friendliness,clean room
Negative: Everything was great
Summary: Nice hotel and nice staff. Diner in the hotel
See All Reviews

Room Arrangement

Room Info Facilities
Deluxe Double Room
Room Type: Double
Room Size: 23 m2
2 Full bed(s) Bed

Bathroom

Towels, Free toiletries, Hairdryer, Shampoo, Toilet, Bathtub, Body soap, Bathtub or shower, Shower, Private bathroom, Toilet paper

Media & Technology

Telephone, TV, Flat-screen TV, Cable channels

General

Air conditioning, Trash cans, Carpeted, Iron, Heating

Kitchen

Refrigerator, Microwave

Living Area

Desk

Bedroom

Alarm clock, Linens

Accessibility

Roll-in shower, Entire unit located on ground floor, Shower chair, Upper floors accessible by stairs only

Room Amenities

Clothes rack, Socket near the bed, Non-feather pillow

Physical distancing

Single-room AC for guest accommodation
Queen Studio
Room Type: Studio
Room Size: 56 m2
1 Twin bed(s) Bed
2 Queen bed(s) Bed

Bathroom

Towels, Free toiletries, Hairdryer, Shampoo, Toilet, Body soap, Bathtub or shower, Shower, Private bathroom, Toilet paper

Media & Technology

Telephone, TV, Flat-screen TV, Cable channels

General

Air conditioning, Trash cans, Carpeted, Heating

Kitchen

Refrigerator, Microwave

Living Area

Desk

Bedroom

Alarm clock, Linens

Accessibility

Upper floors accessible by stairs only

Room Amenities

Socket near the bed, Non-feather pillow

Physical distancing

Single-room AC for guest accommodation

FAQ's

Is this property pet-friendly for guests?

No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.

What time is check-in & check-out at property?

Check-in time for Oak Mar Motel starts counting from 2:00 PM and check-out is until 11:00 AM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Does the property have a swimming pool?

No, this Oak Mar Motel does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in property?

Best-rates for the Oak Mar Motel starts from $92 per night with includes Security/Safety, Restaurant, Guest Services, Breakfast, Air Conditioner, Wheelchair Accessible, Heating, Internet, Kitchen, Laundry, Parking, Balcony/Terrace, Accessibility with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.

Is property a family-friendly place to stay?

Based on the information we have received from the owner or our partner, this is not considered to be a family-friendly property. As reported by the owner or manager, the hotel has not specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the property wheelchair accessible or offer services for disabled guests?

Based on the information received from our partner, the Oak Mar Motel is wheelchair accessible. Likewise, there is an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the property?

Based on the information reported by the owner or manager, the Oak Mar Motel indicates 1 day stay policy at this hotel. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for property?

Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.